Rose-Hulman Institute of Technology Campus Master Plan – Terre Haute, IN

HWC Engineering prepared a campus master plan for Rose-Hulman Institute of Technology to resolve several long-term priorities.

First, the plan outlined a new loop road around the entire campus.

Second, the plan eliminated roadways through the central portion of campus to create a pedestrian-focused area that connected academic buildings and residence halls.

Third, the project master planned new dormitories at the west end of the campus.

HWC NEWSFEED

  • HWC Celebrates King Street Corridor Project Ribbon Cutting in Franklin

    Read more

  • HWC Engineering Ranked As One of the Top 15 Best Places to Work in Indiana

    Read more

Subscribe to NEWS