Stormwater Improvements Study – Worthington, Indiana

HWC completed an IOCRA approved planning grant funded study evaluating the Town’s wastewater and stormwater infrastructure and recommending improvements to the system components for the Town of Worthington, Indiana, located in Greene County.

Regarding the stormwater analysis, first a Neighborhood Drainage Survey was prepared, distributed, collected, compiled and analyzed by HWC. The responses to this survey helped identify six key areas within the Town where stormwater drainage was a problem. From these results, HWC further reviewed and analyzed existing systems and developed recommended stormwater system improvements, including the installation of new storm sewers/inlets, rehabilitation of existing sewers/ditches, re-grading existing ditches, installation of new pipes under the existing rail road, construction of new outlet ditches, new drywell structures, and an overflow detention basin. HWC prioritized the improvements into phases to maximize the benefit to the Town based on the funding source. The overall recommendations of all phases had an estimated cost of approximately $2.8M. However, given the availability of Disaster Relief (DR II) funds through IOCRA in the amount of $1M, the phase recommended, based the location and priority, was estimated at $965,000, thus allowing use of the use of the DR II $1M grant funds.

The project was completed in the fall of 2010.

 

HWC NEWSFEED

  • HWC Trails Increase Character & Connectivity in Indiana Communities

    Read more

  • Project Highlight – Monon Trail Widening & Resurfacing Project

    Read more

Subscribe to NEWS