Water System Improvements – Attica, Indiana

HWC provided planning, design and construction inspection services on this water system improvement project, which included a system evaluation for a city of 3,600 citizens.

Improvements included:
  • 500,000 gallon elevated storage tank
  • Pumping station upgrade
  • Distribution supply system upgrade (20,000 LF of 6”, 8”, & 12” mains and appurtenances)
  • Upgrades implemented a two-zone pressure system utilizing the new elevated tank and an existing ground storage reservoir
  • Construction cost – $2.1M