The Crawfordsville Downtown Loop Trail consists of removing and replacing all curb and gutter, sidewalk, concrete approaches, asphalt street approaches, ADA curb ramps and installation of stormwater improvements along various streets in Crawfordsville, Indiana.

The new construction consists of a 10’ wide hand tooled concrete walkway that runs the length of Grant Avenue, Wabash Avenue to Walnut and Walnut to Main Street. The new concrete walkway will have brick inlays every 40’, as well as intricate brick paver designs at all intersections with Historic Downtown Crawfordsville, etched into the pavers.

The total cost associated with this project was $1.2 Million