HWC provided planning, design and construction inspection services on this water system improvement project, which included a system evaluation for a city of 3,600 citizens.
Improvements included:
- 500,000 gallon elevated storage tank
- Pumping station upgrade
- Distribution supply system upgrade (20,000 LF of 6”, 8”, & 12” mains and appurtenances)
- Upgrades implemented a two-zone pressure system utilizing the new elevated tank and an existing ground storage reservoir
- Construction cost – $2.1M