Attica, IN

Water System Improvements

HWC completed a water utility planning study for the City of Attica. The recommendations included in the preliminary engineering report resulting from the study included improvements to the Town’s water supply, treatment, distribution, and storage system. The study was utilized to secure funding for the project from the Indiana Office of Community and Rural Affairs (IOCRA) and the Indiana Finance Authority’s (IFA) State Revolving Loan Fund (SRF). The project included new buildings and interior piping for the two water supply wells, electrical improvements for the wells including an emergency backup generator, new chemical disinfection equipment, replacement of undersized water mains along with valves and hydrants in the distribution system, and replacement of an existing 500,000-gallon water reservoir with a new 500,000-gallon bolted steel glass-lined ground storage tank. HWC provided all design and construction phase services for the $3 million project, which was completed in 2025.