Jamestown, IN

Stormwater Improvements Project

The Town of Jamestown was experiencing flooding problems for many years in several areas due to inadequate stormwater collection infrastructure and runoff from areas surrounding the Town.  

HWC performed topographic surveying of existing rights-of-way, roads, utilities, and stormwater infrastructure to support drainage improvement design for the Town. In addition to topographic surveying, HWC established existing right-of-way limits and property lines to prepare easement exhibits and descriptions for the new drainage improvement locations.

Phase 1 of the project included construction of Elm Street and Mill Street stormwater improvements, with a total budget of over $800,000.