Prince’s Lakes, IN

Water System Improvements Project

This project included a 400,000 gallon elevated water storage tank to provide increased pressure and storage capacity in the systems north pressure zone as well as enhanced fire protection for the Town. It also included 300’ of 24” water main under Driftwood River and 320’ of 24” water main under US 31 to provide a redundant as-needed water supply at critical locations since the system serves multiple entities including Camp Atterbury, the Town of Trafalgar, Cordy-Sweetwater Water Corporation, as well as Prince’s Lakes. The project also included 8,000’ of new 12” water supply main and new high-service pumps to improve the reliability and efficiency of the water system.