by Toni Takacs | Feb 10, 2025
Brookville, IN
Brookville Pool
After completing a feasibility study, HWC led the Town of Brookville through survey services, design, and construction documents for a new community pool at Brookville Town Park. A key component of this design was integrating lap swimming and other activities in a smaller footprint. The final design included a new activity pool with beach entry, three-lane 25-yard lap pool, water slide with splash down area, new mechanical building, and a renovation of the existing bathhouse/concessions/admissions building.
by Toni Takacs | Feb 10, 2025
Remington, IN
Community Park Trail
HWC worked closely with the Town of Remington to secure a grant from the Indiana Department of Natural Resources Land and Water Conservation Fund to develop a trail system within the new park. The main goals of the project were to create a one-mile long walking and biking trail to connect all areas of the park, including their popular splashpad. HWC provided survey services in the beginning stages of this project.
by Toni Takacs | Feb 10, 2025
Muncie, IN
Kitselman Trail and Trailhead Park
The Kitselman Trailhead is a complex, multi-phased project that will connect the Cardinal Greenway Trail with the White River Trail while providing a gateway park for Muncie’s east side. HWC had the opportunity to provide survey services for this project. Two phases have been constructed (a pedestrian bridge and the east side of the trailhead park) and the third is currently under design. This project was funded by INDOT and the City of Muncie.
by Toni Takacs | Feb 10, 2025
Lafayette, IN
Main Street Streetscape
HWC has provided survey, design, coordination, and construction inspection services for four phases of streetscape along Main Street in downtown Lafayette. Goals of the project were to maximize pedestrian space and allow locations for outdoor dining and public art by introducing bumpouts. Project components include new sidewalk, special paving, street trees, stormwater planters, and installation of decorative bike racks, benches, and trash receptacles. Custom decorative crosswalk surface systems and decals were designed for the farmer’s market and other intersection treatments.
by Toni Takacs | Feb 10, 2025
HWC provided survey and design services to upgrade Mays Park. These updates were made to honor the existing park amenities while bringing in new, much needed facilities to the neighborhood. A new pedestrian crossing at 10th Street has become the epicenter of the park’s revitalization that includes a splash pad, playground, restrooms, a shade structure, a walking trail, and a new parking lot on the north side. A new tennis and pickleball court, restrooms, a shade structure, and a revitalized skate park and basketball courts were provided on the south side.
Recent Comments