Lafayette Vinton Subdivision Water Main Replacement
Lafayette, IN
Vinton Subdivision Water Main Replacement
This water main replacement project consisted of installing new 8’’ DIP throughout the subdivision. 5,269’ in total were installed along with 132 new service lines from the new main to the existing meter pit.
The contractor installed the new 8’’ DIP water main with the corporations installed so they could hydrostatic pressure test the new main and the new corporations jointly. The contractor performed many hydrostatic pressure tests and bacteria tests which HWC oversaw.
The contractor installed 8 new hydrant assemblies throughout the subdivision and removed 3 old hydrant assemblies.