Scottsburg US 31 Road Diet

Scottsburg US 31 Road Diet

Scottsburg, IN

US 31 Road Diet

HWC performed surveying services at the start of the project to help HWC’s transportation team better understand the scope of the project as they provided roadway design, utility coordination, traffic signal planning, and public information meeting coordination services for INDOT’s US 31 Road Diet project. 

The need for this project is to address a number of rear-end traffic collisions while enhancing road safety and the overall quality of traffic flow. US 31 is a four-lane urban principal arterial. Currently, there are no designated lanes for both northbound and southbound vehicles turning left along US 31 in Scottsburg, which has led to this increase of rear-end traffic collisions.

The survey department provided route survey services, supplemented by aerial mapping. These deliverables aided in HWC’s collaboration with INDOT and the City of Scottsburg to develop the road diet concept and establish the project limits. US 31 was converted from four travel lanes (two lanes in each direction) to a three-lane section (one lane in each direction with a two-way left turn lane) from SR 56 to York Road (0.75 miles). The two-way left turn lane will allow motorists to make left hand turns without impacting traffic in the travel lanes of US 31, reducing the number of rear end collisions. US 31 was milled and resurfaced to remove all existing pavement markings and new thermoplastic pavement markings were installed to delineate the three-lane roadway section.

The construction cost of the project was $563,000.

Fountain County Sheriff’s Office & Jail

Fountain County Sheriff’s Office & Jail

Fountain County, IN

Fountain County Sheriff’s Office and Jail

HWC Engineering provided surveying services for the Fountain County Sheriff’s Office and Jail Project.

The project utilized drone imagery and other available data sources to help design and construct a new office and jail facilities with only two weeks of turnaround time.

Seymour Southern Bypass

Seymour Southern Bypass

Seymour, IN

Seymour Southern Bypass

HWC Engineering partnered with another firm to complete topographic and route surveying along a four mile route for a new bypass around the south side of the city of Seymour, Indiana.

HWC also coordinated with an aerial mapping firm that provided base topographic mapping and aerial ortho-photos for the project.

HWC acquired additional topographic surveys in some areas due to route realignments and additions. 

The total survey fee exceeded $100,000. 

Crawfordsville Downtown Loop Trail Phase 2

Crawfordsville Downtown Loop Trail Phase 2

Crawfordsville, IN

Downtown Loop Trail – Phase 2

HWC provided topographic survey to support the design services for the Downtown Loop Trail project in Crawfordsville, Indiana. 

This multi-phased project was conceptualized in the city’s 2010 Bike and Pedestrian Plan, and the scope includes a 10’ wide trail that will create an urban loop connecting Wabash College to downtown Crawfordsville. 

As of January 2018, the project is in the construction document phase and will bid in 2019. 

Veedersburg State Street Improvements

Veedersburg State Street Improvements

Veedersburg, IN

State Street Improvements

HWC is providing design services for State Street in Veedersburg, Indiana. This project is comprised of milling and resurfacing the street, installation of new sidewalks and ADA-compliant curb ramps, new street and road culverts, closing two open ditches on the east end with new storm sewers, and re-grading where necessary to improve drainage, particularly on the south side of the street.