Terre Haute Sanitary District Project 20 – Thompson Ditch/Poplar Street Relief Interceptor

Terre Haute Sanitary District Project 20 – Thompson Ditch/Poplar Street Relief Interceptor

Terre Haute, IN

Sanitary District Project 20 – Thompson Ditch/Poplar Street Relief Interceptor

HWC worked with the Terre Haute Sanitary District to complete this $4.5 million relief interceptor project.

The constructed interceptor in the Thompson Ditch drainage way now intercepts flow from Seelyville and conveys them to the Southside Lift Station via 36”, 48”, and 60” interceptors. The interceptor also collects flow from a combination sewer and force main constructed on Poplar Street to relieve overburdened sewers on Poplar Street.

Finally, an existing regional lift station near the intersection of Poplar Street and SR 46 was upgraded and replaced.

The project involved significant road reconstruction, traffic planning, land acquisition, and public awareness.

 

Zionsville Irongate Storm Sewer Improvements Study

Zionsville Irongate Storm Sewer Improvements Study

Zionsville, IN

Irongate Storm Sewer Improvements Study

HWC provided engineering and survey services for Zionsville, Indiana to complete the development of a stormwater planning study for the Irongate Storm Sewer system and contributing drainage watershed. The study area was generally the area west of Ford Road, south of Oak Street, east of Lexington Drive, and north of the adjacent subdivision located south of the Irongate Subdivision.

The project included collecting GIS data which was then provided to the town, allowing them to update their own GIS system with more detailed information. Additionally, research into easements, property ownership, and sewer ownership was completed.

Through analysis of the existing system, HWC Engineering recommended two phases of proposed improvements that address the drainage issues. The study was completed in 2015 and construction of the first phase of improvements began in 2020.

Batesville Stormwater Improvement Projects

Batesville Stormwater Improvement Projects

Batesville, IN

Stormwater Improvement Projects

HWC provided survey, design, bidding, construction engineer, and inspection services for the six projects identified in the Batesville Stormwater Planning Study.

The six projects include:

    1. EGS Culvert Replacement & Ditch Improvements
    2. Huntersville/Woodlawn Storm Improvements
    3. Ripley/Vine Storm Sewer Replacement
    4. Sycamore Lake Water Quality Improvements
    5. Central Avenue Storm Sewer
    6. Park Avenue Storm Sewer

The projects included approximately 4,000 linear feet of storm sewer installation, along with a culvert replacement, ditch grading, and hydrodynamic separator.

The projects were completed at a construction cost of $1.3 million with construction funded through an OCRA grant.

Muncie Madison Street Underpass Flooding Mitigation

Muncie Madison Street Underpass Flooding Mitigation

Muncie, IN

Madison Street Underpass Flooding Mitigation

HWC provided planning, design, and project management services for the Madison Street Underpass Flooding Mitigation project in Muncie, Indiana.

Utilizing conveyance upgrades in conjunction with stormwater pumping and storage, HWC addressed a critical drainage hazard in the heart of Muncie. Madison Street, the arterial north/south road through the City, crosses under three railroad lines, which creates a regional low-point that ties into one of the City’s CSO trunk-lines.

The study included hydrologic modeling of contributing watersheds, hydraulic modeling of several nearby CSO and separate storm sewer systems, and the development of numerous design alternatives to determine a solution to address persistent flooding and stormwater collection.

The recommended project provided capacity for the 100-year event and had an approximate cost of $6.7 million. The first phase of the project provided protection up to a 10-year event at an initial approximate cost of $4 million. Future phases, if implemented, will bring the system up to the full 100-year capacity.

Improvements included two 13,000 GPM 250hp storm pumps, two 1,600 GPM 20hp force main pumps, a 750,000-gallon ground storage tank, 2,200’ of 16” force main directionally drilled, backup generator, wet well, control valves, and 500’ of gravity storm sewers to the station. The first phase was funded via the Guaranteed Savings/Guaranteed Maximum Price (GMAX) procurement method, and Bowen Engineering was the selected savings provider/contractor, working closely with HWC’s staff during design and construction.

West Terre Haute Stormwater Master Plan

West Terre Haute Stormwater Master Plan

West Terre Haute, IN

Stormwater Master Plan

HWC completed a stormwater master plan for West Terre Haute, Indiana, a town with a long history of drainage and flooding problems. Several levee systems were constructed in the 1960s and 1970s to protect the town from high river stage events.

While the levee system was effective, the town’s internal (minor) drainage systems were inadequate. No comprehensive solution existed to provide positive drainage within the town when the river stage was up and the flood gates for the gravity drainage outlet pipes through the levee were closed. During Wabash River flood events, temporary pumping facilities were set up to discharge excess water.