Aurora 2nd Street

Aurora 2nd Street

Aurora, IN

2nd Street Rehabilitation

HWC replaced all sidewalks and curb and gutter in this downtown District of Aurora, Indiana. This project included minor drainage improvements, as well as the installation of pavement markings, new signage, and decorative crosswalks using pavers. ADA compliant curb ramps were also constructed and the pavement received a preventative maintenance mill and overlay of 1.5”. Coordination with business owners was critical as sidewalk was removed and replaced and as milling and paving operations ensued. HWC not only designed the project, but developed the bidding documents and conducted construction observation and administration. The project was completed at the end of 2018.

 

Moores Hill Main Street

Moores Hill Main Street

Moores Hill, IN

Main Street Rehabilitation

HWC provided both crack sealing and a PM 1.5” mill and overlay in different sections of this Main Street Rehabilitation project. HWC also met with the Town and Contractor to identify specific areas that required full-depth patching.

Project improvements included reconstruction of curb and gutter and sidewalks, ADA curb ramps, minor drainage improvements to the storm sewer system, and reworking of sidewalks and curb ramps in front of the Town Hall to improve pedestrian and ADA access.

This project required design, bidding services, construction observation, and administration. Throughout the project, HWC kept the Town informed on the construction status and involved them when necessary to respond to the Contractor’s questions and concerns. The project was completed at the end of 2018.

Muncie Kitselman Trail and Trailhead Park

Muncie Kitselman Trail and Trailhead Park

Muncie, IN

Kitselman Trail and Trailhead Park

The Kitselman Trailhead is a complex, multi-phased project that will connect the Cardinal Greenway Trail with the White River Trail while providing a gateway park for Muncie’s east side. HWC had the opportunity to collaborate with Flatland Resources and Land Collective on this project. Two phases have been constructed—a pedestrian bridge and the east side of the trailhead park–and the third is currently under design. This project was funded by INDOT and the City of Muncie.

Indiana State University River Campus Trail

Indiana State University River Campus Trail

Terre Haute, IN

Indiana State University River Campus Trail

HWC provided design, coordination, and construction administration for the River Campus Trail Project. This urban trail connects the Indiana State University campus to a growing area of campus along the Wabash riverfront, west of US Highway 41. The final design included a meandering trail to bring pedestrians safely under U.S. Highway 41 along an existing railroad corridor to the track and field stadium and along the top bank of the Wabash River. Custom engraved concrete planters serve as a safety barrier between vehicular traffic and the trail.

North Vernon Muscatatuck Trail

North Vernon Muscatatuck Trail

North Vernon, IN

Muscatatuck Trail

As a part of the city’s Stellar Communities effort, HWC led the design and implementation of the Muscatatuck Trail, which connects the Muscatatuck County Park to downtown North Vernon with a multi-use trail. The trail begins in downtown North Vernon and extends south through several neighborhoods along a former railroad right-of-way before ultimately connecting to the Muscatatuck County Park. The county park has existing mountain biking and hiking trails, which serve as a natural connection to this multi-use trail.